Technical Instruction

WALL HUNG BASIN

As per shown in the picture, the rag bolt must be grouted into the cement/concrete wall. The bolts must be fixed to the cement/concrete wall. Allow setting & checking than install it using nut and washer.

COUNTER WASHBASIN

At the beginning

A skilled or experienced person should install counter lavatories.

Avoid using adhesive with this product.

Check the waste area and supply tubing if required.

Do not open the lavatory from its protective carton until you are ready for installation.

Please follow all local building and plumbing codes.

MATERIAL & TOOLS

Measure tape, Keyhole or saber saw, Hammer, Glasses, Rags or Paper toweling, Drill (1/2 dia, drill bit or larger), Pencil, sealant, sharp knife or scissors.

INSTALLATION OF LAVATORY

Please Note : Please install it in a way that future removal from underneath the counter top is possible without damaging the counter top.

Please check the desired location for clearance between the back splash, faucet, Fixture and cabinet.

Please cut the template.

Please carefully trace the template on the counter top directed.

Please mark the faucet hole centerline on the counter top.

Please drill a 1/2″ pilot on the inside of the cut line.

For Wood Counter tops:

For Marble Counter tops:

For All Installations: